CFBISD McWhorter Elementary School Renovations

The McWhorter Elementary renovation included updates to the school entry and main office, the main corridor, the cafeteria, and the library. The library was opened up and enlarged to include a maker space, broadcasting room, and green screen studio. Climate control and energy efficiency were improved throughout the campus with the installation of a new roof and RTUs.

Read more

Lindale ISD High School Additions & Renovations

The Lindale High School campus received major additions with a new, two-story academic wing, new front entry, new kitchen with an expanded student eating area, new practice gym, and a new indoor practice facility. The two-story classroom addition includes multiple science labs, a speech and debate room equipped with a speaking stage, a computer lab with the latest Apple computers, and a fully functioning media room with green room capabilities, stage lights, and state-of-the-art film equipment.  The academic expansion gave the high school over 38,000 more square feet. The new kitchen and expanded student eating area added 3,100 more square feet to the campus. In addition to the all-new kitchen, this new space includes additional seating for students and a new serving line with hot and cold food staging areas. The additional practice gym is a free-standing, brick building located on the southeast side of the building.

Read more

Lindale ISD – Stadium Renovation

The Lindale ISD High School Stadium received a remodel with a total of 8,500 seats, a new home-side concession stand and a new state-of-the-art press box. The two level press box includes a media room, coach’s rooms and an alumni room. The alumni room is complete with a kitchenette, bar height tables and two levels of viewing area. Additional parking on both the home and visitor sides was also added. The construction of this project was completed in 2019.

Read more

Jacksonville ISD – Historic Tomato Bowl Renovations

Renovations to the Tomato Bowl included new LED lighting, grass turf, windows, as well as:

  • New restrooms
  • New home team dressing room
  • New visitor dressing room
  • New concession stands
  • All new seating for home and visitors
  • State-of-the-art press box with a VIP suite
  • ADA accessibility throughout the stadium

A bit of history was preserved by leaving the historic red stone walls that surround the stadium untouched, along with the walls of the ticket/concession entry building and the exterior features outside of the stadium were left intact to keep the original look built by the WPA in the late ’30s.

Read more

Lewisville ISD – Administrative Center

Previously a retail strip mall, the Lewisville ISD Administrative Center underwent a renovation that involved building into additional office space procured by the district. This space made additional general office space, executive offices, conference rooms, computer labs, storage, break rooms, reception areas and more.

This project was completed in a manner that allowed staff to move into their new spaces incrementally as the work progressed. Construction was completed in 2018.

Read more

Fort Sam Houston ISD – Cole High School PE/Athletic Improvements

Project Plans and Specs

The renovated stadium included new field turf, new lights, new home/visitor stands, new entry, new concession area, new restrooms, a new scoreboard, new fencing, new storage building, concrete sidewalks & paving, as well as, new press box. In addition, home stands were relocated from the east to the west side of the stadium. Installed a new track, which includes a new synthetic turf sports field & synthetic running track.

Read more

Harts Bluff ISD – K-8 Additions and Renovations

Project Overview

The 16,674 SF school consisted of student collaboration project labs, group activity labs, teacher workstations, administrative offices, a conference room, new parking, bus loops, and parent pick-up/drop-off.

 

“Jackson Construction reaffirmed my confidence in the Construction Management-at-Risk process when you have the right team ‘on the job’.”
Terry Hoyle, Principal — Stantec Architecture Inc.

Read more