CFBISD Vivian Field Middle School

Major MEP system upgrades and renovations to 180,000+ SF. Renovations included fine arts classroom/performance area, kitchen, classrooms, new collaboration spaces, and courtyards. Technology upgrades included wireless systems, phone systems, and a secure, climate-controlled server space.

Read more

Marion ISD- 2019 Bond Program

This bond program consists of work performed on 3 separate campuses. The Marion High School addition consists of a two-story, 20,000 SF addition connecting to the existing high school and includes new science labs and classrooms. The Krueger Elementary project consists of a 30,000 SF addition including new cafetorium, kitchen, and classroom wing. The Marion MS East project consists of an 1,800 SF addition for CTE shop & restrooms.

Read more

Lewisville ISD Memorial Elementary- STEM Academy

This new two-story 118,762 SF elementary school is designed to serve around 3,000 students from kindergarten to 5th grade.  In addition to the STEM Academy, the school includes a precast concrete storm shelter that functions as a gym and also houses a back-up data center for the school district.  This space incorporates three educational wings, dining hall / cafeteria, large open library learning space and secured entrances.  Outdoor amenities include a large turf field area, basketball court, and two shaded playground areas designated to specific age groups.

Read more

CFBISD R.L. Turner High School Renovations

Major MEP system upgrades and renovations to 400,000+ SF. Upgrades and expansions to CTE programs included EMT, cosmetology, ag sciences, auto body/collision, biomed, and media. Other renovations/upgrades included new collaboration spaces, courtyards, access controlled exterior doors, wireless systems, phone systems, and a secure, climate-controlled server space.

Read more

Alba-Golden ISD Ag Barn

New 12,000 SF pre-engineered metal building that includes an animal barn, feed storage, cattle pens, wash areas, and restrooms. The project includes parking for trailers, staff, and students.

Read more

Lindale ISD High School Indoor Practice Facility

The Lindale High School Multi-Purpose Facility is a 61,182 square foot, clear-span building with an 80 yard synthetic turf field. This facility provides an indoor practice space for various Lindale ISD teams and groups. With a mechanically lowered divider net at the 50-yard line, the area can easily be divided in half to accommodate different groups or activities. Net cages can be lowered from the ceiling to accommodate batting, throwing, or kicking practice and net goalposts can be lowered at each end zone.  The north end and west side feature viewing decks.

Read more

CFBISD McWhorter Elementary School Renovations

The McWhorter Elementary renovation included updates to the school entry and main office, the main corridor, the cafeteria, and the library. The library was opened up and enlarged to include a maker space, broadcasting room, and green screen studio. Climate control and energy efficiency were improved throughout the campus with the installation of a new roof and RTUs.

Read more