Elementary, Junior High and CTEC Additions that will include Industrial Arts, Health Science, Floral/Horticulture, Vet Tech/Animal Science, and general classrooms.
Athletic Upgrades include locker rooms, field house, and baseball field.
The new center will house more than 30 classrooms along with a library, kitchen, and gymnasium, greatly expanding access to pre-kindergarten for families across Longview ISD.
10,000 SF pre-engineered metal building addition that will expand and modernize the existing facility.
The new school will be completed in two phases. Phase I: 32,960 SF classroom building, associated parking lot and drive followed by the demolition of the existing elementary. Phase II: the addition of a 11,910 SF gymnatorium building, associated parking lots and drives.
Athens Middle School Additions & Renovations
This new two-story campus will feature 24 classrooms, an 11,000 SF gymnasium, an 8,700 SF auditorium, and a 3,000 SF band hall. The facility will also include administrative areas, science and computer labs, and collaborative learning spaces. Designed with safety, accessibility, and innovation in mind, the school will provide students with a modern environment that supports academic growth, creativity, and community involvement.
Grades 3-4. 750 student capacity. Ground-up two-story school with a gym that will also serve as a storm shelter. Common area has a children’s slide from second floor to first. Large media center, playground and game area and two parking lots with 289 spaces.
Six classroom additions (adding 150 student capacity) and restrooms. Repair campus drainage, expansion of cafeteria, courtyard addition, interior renovations.
Adding capacity for over 300 students; includes lab settings, classroom space, and storage to support a wide range of Career and Technical Education (CTE) programs including Auto Tech, Business & Finance, Construction, Culinary Arts, Education & Training, Engineering, Horticulture/Floral, Health Science, Information Technology, Law Enforcement, Marketing, Vet Tech, and Welding.
Security upgrades and renovation work includes upgrade to all building entries, renovations of vestibules and administration areas and exterior renovations to primary and elementary playgrounds. High school additions and renovations work includes, new competition gym and athletics, new performing arts, black box, and CTE additions that will connect existing high school to cafeteria. Renovations to existing cafeteria and entire high school interior for dedicated library and additional classroom space.
This project includes the renovation and replacement of existing building components including new MEP, finishes, A/V equipment, technology and security equipment, casework, and exterior site improvements.
This project includes the renovation and replacement of existing building components including new MEP, finishes, A/V equipment, technology and security equipment, casework, and exterior site improvements, including a roof replacement component.
Package 1 – Renovations for Creekview High School include CTE Classrooms, dance floor remediation, and the SPED area. Renovations for Kent Elementary include food service equipment replacements, corridor finishes, Pre-K & SPED areas, gym & fine arts improvements. The scope of work for Rainwater Elementary includes playground replacement, SPED renovations, fine art improvements, and STEM renovations. Package 2 – The Davis Elementary project includes interior renovations to SPED, stage, art, and music areas. We are replacing the playground with new surfacing, equipment, and shades. We are re-roofing roughly 30% of the campus. The Thompson Elementary project also includes interior renovations to SPED and kindergarten classroom areas. We are re-roofing roughly 80% of the campus.
9,400 SF new gymnasium that will act as a storm shelter for the entire campus. The new gymnasium facade is ICF construction with a mixture of metal panels and brick.
Projects include a new kitchen, cafeteria addition that doubles as storm shelter, fire alarm and fire sprinklers, classroom additions, and renovation of the existing kitchen to SPED classrooms.
A new 3-story, 135, 000 SF high school with a new practice gym that doubles as storm shelter, cafeteria, science labs, culinary arts, theater and music classrooms, SPED area, computer labs. New parking lot, new football practice field, new bus drive connecting three schools.
New Elementary School (69,700 SF), HS locker room add/reno, demo and replace field house, relocate transportation building
Hays Dahlstrom & Wallace Middle School. Dahlstrom Middle School work includes replacement of 73 tons of HVAC split units, one boiler, new site drainage and loop install on north side of property, new canopy from building to new drive, new sidewalk and repairs/replacements of existing drives. Wallace Middle School work includes replacement of 31 tons RTU’s, 43 tons of HVAC split units, 16,150 cfm DOAS units, one boiler and 16,500 SF of modified bitumen roofing.
This six-phase project encompasses 60,000 SF of new construction and 25,000 SF of renovations. Key elements include a new Fine Arts building and cafeteria at the High School, upgrades to the libraries at both the Junior High and High School, and the addition of a new administrative area at the Middle School.