News

CFBISD Vivian Field Middle School

Major MEP system upgrades and renovations to 180,000+ SF. Renovations included fine arts classroom/performance area, kitchen, classrooms, new collaboration spaces, and courtyards. Technology upgrades included wireless systems, phone systems, and a secure, climate-controlled server space.

Read more

Marion ISD- 2019 Bond Program

This bond program consists of work performed on 3 separate campuses. The Marion High School addition consists of a two-story, 20,000 SF addition connecting to the existing high school and includes new science labs and classrooms. The Krueger Elementary project consists of a 30,000 SF addition including new cafetorium, kitchen, and classroom wing. The Marion MS East project consists of an 1,800 SF addition for CTE shop & restrooms.

Read more

Lewisville ISD Memorial Elementary- STEM Academy

This new two-story 118,762 SF elementary school is designed to serve around 3,000 students from kindergarten to 5th grade.  In addition to the STEM Academy, the school includes a precast concrete storm shelter that functions as a gym and also houses a back-up data center for the school district.  This space incorporates three educational wings, dining hall / cafeteria, large open library learning space and secured entrances.  Outdoor amenities include a large turf field area, basketball court, and two shaded playground areas designated to specific age groups.

Read more

CFBISD R.L. Turner High School Renovations

Major MEP system upgrades and renovations to 400,000+ SF. Upgrades and expansions to CTE programs included EMT, cosmetology, ag sciences, auto body/collision, biomed, and media. Other renovations/upgrades included new collaboration spaces, courtyards, access controlled exterior doors, wireless systems, phone systems, and a secure, climate-controlled server space.

Read more

Alba-Golden ISD Ag Barn

New 12,000 SF pre-engineered metal building that includes an animal barn, feed storage, cattle pens, wash areas, and restrooms. The project includes parking for trailers, staff, and students.

Read more

Fort Sam Houston ISD Elementary Gym

The new Fort Sam Houston Elementary Gymnasium is a 15,000 SF stand-alone building on an active campus, built roughly 70 feet from the existing building and 25 feet from the playground. This is a pre-engineered metal building and contains a gym, classrooms, and restrooms.

Read more

Lindale ISD High School Additions & Renovations

The Lindale High School campus received major additions with a new, two-story academic wing, new front entry, new kitchen with an expanded student eating area, new practice gym, and a new indoor practice facility. The two-story classroom addition includes multiple science labs, a speech and debate room equipped with a speaking stage, a computer lab with the latest Apple computers, and a fully functioning media room with green room capabilities, stage lights, and state-of-the-art film equipment.  The academic expansion gave the high school over 38,000 more square feet. The new kitchen and expanded student eating area added 3,100 more square feet to the campus. In addition to the all-new kitchen, this new space includes additional seating for students and a new serving line with hot and cold food staging areas. The additional practice gym is a free-standing, brick building located on the southeast side of the building.

Read more