Interior/Exterior renovations to Sanctuary building. Key features consists of new AV system, pews, stage and baptistery, metal roof, windows and sidewalk additions


Interior/Exterior renovations to Sanctuary building. Key features consists of new AV system, pews, stage and baptistery, metal roof, windows and sidewalk additions

The project includes a 3,500 square foot renovation of existing fine arts space and a 7,750 square foot black box theater addition, which will include storage, office space, and new gang restrooms.

MEP upgrades, interior & exterior upgrades, collaboration rooms, secure and climate-controlled server space at each campus, as well as wireless upgrades.

Major MEP system upgrades and renovations to 180,000+ SF. Renovations included fine arts classroom/performance area, kitchen, classrooms, new collaboration spaces, and courtyards. Technology upgrades included wireless systems, phone systems, and a secure, climate-controlled server space.

This bond program consists of work performed on 3 separate campuses. The Marion High School addition consists of a two-story, 20,000 SF addition connecting to the existing high school and includes new science labs and classrooms. The Krueger Elementary project consists of a 30,000 SF addition including new cafetorium, kitchen, and classroom wing. The Marion MS East project consists of an 1,800 SF addition for CTE shop & restrooms.

This new two-story 118,762 SF elementary school is designed to serve around 3,000 students from kindergarten to 5th grade. In addition to the STEM Academy, the school includes a precast concrete storm shelter that functions as a gym and also houses a back-up data center for the school district. This space incorporates three educational wings, dining hall / cafeteria, large open library learning space and secured entrances. Outdoor amenities include a large turf field area, basketball court, and two shaded playground areas designated to specific age groups.

Major MEP system upgrades and renovations to 400,000+ SF. Upgrades and expansions to CTE programs included EMT, cosmetology, ag sciences, auto body/collision, biomed, and media. Other renovations/upgrades included new collaboration spaces, courtyards, access controlled exterior doors, wireless systems, phone systems, and a secure, climate-controlled server space.

New 12,000 SF pre-engineered metal building that includes an animal barn, feed storage, cattle pens, wash areas, and restrooms. The project includes parking for trailers, staff, and students.

New 7,200 SF four-provider clinic with exam rooms, X-ray facilities, and administrative offices. The last phase of the project includes moving the existing staff into the new space and then demolishing the existing structure.

Complete 20 yr re-fresh including re-roofing, new RTU’s, ceilings, flooring, F/A and sprinkler systems, paint, door, and hardware. Convert library to STEM space and upgrade main entrances to secured spaces including card access and ballistic glazing.