News

CFB ISD – Sheffield Elementary School

One of the first schools in CFBISD to implement the updated Educational Specifications supporting schools for the 21st century, Sheffield Elementary School is organized around a central
learning courtyard. The courtyard features learning environments that support the various teaching environments around the school, with key connections for indoor and outdoor learning: Art Studios, Dining Commons, Learning Commons, and the Library Media Center.

The campus is organized into team teaching “learning villages” of 6 classrooms that surround a shared collaborative space. The Collab has a “pop up presentation” area and tiered learning
environment. Each collab has direct access to the courtyard and to the playgrounds surrounding the campus. The gymnasium and cafeteria are clustered together to create a large shared tornado
shelter that can accommodate the entire population of the school.

Read more

West ISD – West Elementary School

West ISD received a new elementary school replacing the existing school built in 1972. The new elementary school is two-story 86,793 SF. This includes 2 wings of learning with music room, steam lab, multiple special education classes, and five classrooms for each grade leave Pre-K to 5th grade. The library was designed and built around the train heritage of West with train depot and reading tunnel and caboose. The gym is fitted with adjustable basketball goals and volleyball equipment and is constructed per the ICC 500 storm shelter requirements. The cafeteria is a multifunctional space with a stage to have ceremonies and school productions. The new West Elementary school is constructed and designed for a safe, exciting, and fun place to learn and grow for many years to come.

Read more

Little Elm ISD – Indoor Multi-Purpose Facility

This new facility consists of a 60,000 SF indoor multi-use field and an additional 40,452 SF two-story space for coaches’ offices and six locker rooms. It includes an 80-yard practice turf field and batting cages that will have dropdown retractable divider nets in four locations that can be used for baseball, softball and golf. This facility will give LEISD a second weight room, which will help with equity when it comes to weight room access. It addition to all outdoor sports, it can be used for any other group, such as fine arts, who needs to practice during inclement or extreme hot/cold weather.

Read more

CFBISD Vivian Field Middle School

Major MEP system upgrades and renovations to 180,000+ SF. Renovations included fine arts classroom/performance area, kitchen, classrooms, new collaboration spaces, and courtyards. Technology upgrades included wireless systems, phone systems, and a secure, climate-controlled server space.

Read more

Marion ISD- 2019 Bond Program

This bond program consists of work performed on 3 separate campuses. The Marion High School addition consists of a two-story, 20,000 SF addition connecting to the existing high school and includes new science labs and classrooms. The Krueger Elementary project consists of a 30,000 SF addition including new cafetorium, kitchen, and classroom wing. The Marion MS East project consists of an 1,800 SF addition for CTE shop & restrooms.

Read more