CURRENT PROJECTS

West Rusk CCISD – New Elementary School

Location: New London, TX
Architect: Harris Craig Architects
Value: $22M

The new school will be completed in two phases. Phase I: 32,960 SF classroom building, associated parking lot and drive followed by the demolition of the existing elementary. Phase II: the addition of a 11,910 SF gymnatorium building, associated parking lots and drives.

Grand Saline ISD – New Middle School

Location: Grand Saline, TX
Architect: Thompson Architects Group Inc.
Value: $38M

This new two-story campus will feature 24 classrooms, an 11,000-square-foot gymnasium, an 8,700-square-foot auditorium, and a 3,000-square-foot band hall. The facility will also include administrative areas, science and computer labs, and collaborative learning spaces. Designed with safety, accessibility, and innovation in mind, the school will provide students with a modern environment that supports academic growth, creativity, and community involvement.

Longview ISD – Early Childhood Learning Center

Location: Longview, TX
Architect: GFF Designs
Value: $50.2M

The new center will house more than 30 classrooms along with a library, kitchen, and gymnasium, greatly expanding access to pre-kindergarten for families across Longview ISD.

Anna ISD – Ora Bell Russell Elementary School

Location: Anna, TX
Architect: Claycomb Associates
Value: $46M

This new 2-story school features classrooms, administrative spaces, art and music rooms, specialized program areas, a media center, and a cafeteria. The gymnasium is designed to also serve as an ICC-500 storm shelter, providing enhanced safety for the entire campus.

Marion ISD – 2023 Bond Projects

Location: Marion, TX
Architect: O’Connell Robertson
Value: $66M

Security upgrades and renovation work includes upgrade to all building entries, renovations of vestibules and administration areas and exterior renovations to primary and elementary playgrounds. High school additions and renovations work includes, new competition gym and athletics, new performing arts, black box, and CTE additions that will connect existing high school to cafeteria. Renovations to existing cafeteria and entire high school interior for dedicated library and additional classroom space.

Navarro College – Albritton Building Renovations 

Location: Corsicana, TX
Architect: Harris Craig Architects
Value: $12.5M

Grades 3-4. 750 student capacity. Ground-up two-story school with a gym that will also serve as a storm shelter. Common area has a children’s slide from second floor to first. Large media center, playground and game area and two parking lots with 289 spaces.

Mabank ISD – New Elementary School

Location: Mabank, TX
Architect: Claycomb Architects
Value: $44M

Grades 3-4. 750 student capacity. Ground-up two-story school with a gym that will also serve as a storm shelter. Common area has a children’s slide from second floor to first. Large media center, playground and game area and two parking lots with 289 spaces.

Mabank ISD – Junior High Additions & Renovations

Location: Mabank, TX
Architect: Claycomb Architects
Value: $37.2M

Six classroom additions (adding 150 student capacity) and restrooms. Repair campus drainage, expansion of cafeteria, courtyard addition, interior renovations.

Mabank ISD – High School CTE Addition

Location: Mabank, TX
Architect: Claycomb Architects
Value: $34.7M

Adding capacity for over 300 students; includes lab settings, classroom space, and storage to support a wide range of Career and Technical Education (CTE) programs including Auto Tech, Business & Finance, Construction, Culinary Arts, Education & Training, Engineering, Horticulture/Floral, Health Science, Information Technology, Law Enforcement, Marketing, Vet Tech, and Welding.

Mabank ISD – Intermediate School Renovations

Location: Mabank, TX
Architect: Claycomb Architects
Value: $5M

Renovate and upgrade restrooms, additional parking and driveways, interior renovations.

Lewisville ISD – Lewisville & The Colony High School Athletics

Location: Lewisville, TX
Architect: Huckabee
Value: $5.6M

Boys track locker room 20-year refresh, baseball concessions replacement, and restroom renovations

Lewisville ISD – Vickery Elementary 20-Year Refresh

Location: Flower Mound, TX
Architect: Huckabee
Value: $14M

Renovation and replacement of mechanical, electrical, and plumbing systems, paint, roofing, flooring, wall finishes, A/V equipment, technology and security equipment, casework, doors and hardware. The project will also include a new playground and shade structure.

Lewisville ISD – Rockbrook Elementary 20-Year Refresh

Location: Lewisville, TX
Architect: Huckabee
Value: $14M

Renovation and replacement of mechanical, electrical, and plumbing systems, paint, roofing, flooring, wall finishes, A/V equipment, technology and security equipment, casework, doors and hardware. The project will also include a new playground and shade structure.

Lewisville ISD – Creek Valley Middle School 20-Year Refresh

Location: Carrollton, TX
Architect: VLK Architects
Value: $21M

This project includes the renovation and replacement of existing building components including new MEP, finishes, A/V equipment, technology and security equipment, casework, and exterior site improvements.

Lewisville ISD – Durham Middle School 20-Year Refresh

Location: Lewisville, TX
Architect: VLK Architects
Value: $21M

This project includes the renovation and replacement of existing building components including new MEP, finishes, A/V equipment, technology and security equipment, casework, and exterior site improvements, including a roof replacement component.

Carrollton-Farmers Branch ISD – Farmers Branch Elementary School Replacement

Location: Farmers Branch, TX
Architect: Glenn Partners
Value: $45.9M

The replacement school will have modern safety and security features, large open Media Center, a gym that doubles as a storm shelter, special education that is properly planned, play areas for younger and older students, and a protected learning courtyard. The school will serve approximately 750 students, grades PreK through 5th.

Carrollton-Farmers Branch ISD -Carrollton Elementary School Replacement

Location: Carrollton, TX
Architect: Glenn Partners
Value: $48M

The replacement school will have modern safety and security features, large open Media Center, a gym that doubles as a storm shelter, special education that is properly planned, play areas for younger and older students, and a protected learning courtyard. The school will serve approximately 750 students, grades PreK through 5th.

Carrollton-Farmers Branch ISD – McKamy & McWhorter Elementary Renovations

Location: Dallas, TX
Architect: Glenn Partners
Value: $10M

McKamy: Pre-K classroom upgrades, renovations to STEM and collaboration spaces, and the installation of permanent walls and doors. Additional improvements include the replacement of a play structure with new turf and a shade canopy, renovations to art, music, and stage areas, and system upgrades such as electrical, plumbing, HVAC controls, exhaust fans, and a partial roof replacement. Special education spaces will also receive targeted renovations.

At McWhorter Elementary School, the replacement of selected HVAC units, exhaust fans, and ventilators, along with partial roof replacement and special education renovations.

Carrollton-Farmers Branch ISD – Rosemeade Elementary School Renovations

Location: Carrollton, TX
Architect: DLR Group
Value: $11.86M

This project is a complete gut and remodel of the original classrooms and special education areas. In the common spaces, we will be replacing all of the kitchen equipment, providing new finishes in the gymnasium, and new finishes in the music/stage area. Construction will be multi-phased working during school operations from June 2025 to August 2026.

Carrollton-Farmers Branch ISD – Blalack Middle School Renovations

Location: Carrollton, TX
Architect: Corgan Architects
Value: $34.7M

Complete gut and refresh to the entirety of existing middle school. Includes bringing in (16) portable classrooms and associated utility connections. Multi-Phased interior renovations throughout the entire campus, including a front entry renovation, classroom renovations, installation of a pop-up skylight roof by removing existing concrete tee roof deck and adding structural steel, and replacing the entirety of the existing sanitary sewer line running underneath the structural slab on void.

Burleson ISD – Mound Elementary School Gym Addition

Location: Burleson, TX
Architect: Pfluger Architects
Value: $6.5M

9,400 SF new gymnasium that will act as a storm shelter for the entire campus. The new gymnasium facade is ICF construction with a mixture of metal panels and brick.

Rice ISD – New Early Childhood Education Center

Location: Rice, TX
Architect: Claycomb Architects
Value: $9M

Newly renovated student locker room and training facility featuring updated locker rooms, training rooms approximately 4,714 square feet. New single story athletic facility including weight room and media room, approximately 8,338 SF.

Hughes Springs ISD – Field House Renovation

Location: Hughes Springs, TX
Architect: Godwin Design Architects
Value: $4.5M

Newly renovated student locker room and training facility featuring updated locker rooms, training rooms approximately 4,714 square feet. New single story athletic facility including weight room and media room, approximately 8,338 SF.

Pittsburg ISD – Junior High Additions & Renovations

Location: Pittsburg, TX
Architect: BWA Architects
Value: $17M

Projects include a new kitchen, cafeteria addition that doubles as storm shelter, fire alarm and fire sprinklers, classroom additions, and renovation of the existing kitchen to SPED classrooms.

Pittsburg ISD – New High School

Location: Pittsburg, TX
Architect: BWA Architects
Value: $65M

A new 3-story, 135, 000 SF high school with a new practice gym that doubles as storm shelter, cafeteria, science labs, culinary arts, theater and music classrooms, SPED area, computer labs. New parking lot, new football practice field, new bus drive connecting three schools.

Elysian Fields ISD – 2024 Bond Program

Location: Elysian Fields, TX
Architect: Harris Craig Architects
Value: $45.9M

New Elementary School (69,700 SF), HS locker room add/reno, demo and replace field house, relocate transportation building

Hays CISD – Bid Package 6

Location: Kyle, TX
Architect: O’Connell Robertson
Value: $8.3M

Hays CISD – Dahlstrom & Wallace MS

Location: Kyle, Texas , Buda, Texas
Architect: O’Connell Robertson
Value: $9.5M

Hays Dahlstrom & Wallace Middle School

Dahlstrom Middle School work includes replacement of 73 tons of HVAC split units, one boiler, new site drainage and loop install on north side of property, new canopy from building to new drive, new sidewalk and repairs/replacements of existing drives.

Wallace Middle School work includes replacement of 31 tons RTU’s, 43 tons of HVAC split units, 16,150 cfm DOAS units, one boiler and 16,500 SF of modified bitumen roofing.

Mount Vernon ISD – 2023 Bond Program

Location: Mount Vernon, Texas
Architect: WRA Architects
Value: $38M
Size: 60,000 Additional SF, 25,000 Renovated

Mount Vernon ISD – 2023 Bond Program

This six-phase project encompasses 60,000 SF of new construction and 25,000 SF of renovations. Key elements include a new Fine Arts building and cafeteria at the High School, upgrades to the libraries at both the Junior High and High School, and the addition of a new administrative area at the Middle School.